Rectory Update: Almost Done!
Not much to report at the Rectory, as the punch list is nearly complete. We spread the gravel under the deck, the backsplash tile in the kitchen was installed, the faulty vents on the roof were replaced and some additional electrical work was completed. We’re down to just a few remaining items, such as waiting for the doors to be delivered so that they can be installed in the kitchen, sunroom and porch. We’ll be able to do the final inspections and close out the project once the doors are installed.